by north | May 13, 2015 | Uncategorized
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Addition of twenty two sensors, transmitters and associated production of cable installations through which the sensor signals are introduced into the electronic subsystem modules. By processing the sensor signal output solutions are available in two directions. In a domain to use a relay contact output with the activation of the signal for each of the sets of two-level warning and exclusion The second domain is available on the communication ports (RS 232, RS 485 and Ethernet) from which information about the signal state of the fifteen sensors assumes a superior system. System is installed in “Vlasinske” Hydro-power plant. In accordance with the terms of reference next measurements are covered: Sensor of relative vibrations, generator – X axis Sensor of relative vibrations, generator – Y axis Sensor of relative vibrations, turbine – X axis Sensor of relative vibrations, turbine – Y axis Sensor of relative shifts, generator shaft – axial direction Sensor of absolute vibrations, generator – X axis Speed of rotation sensor, generator – 1 imp/ob Sensor of absolute vibrations, generator – Y axis Sensor of absolute vibrations, turbine – X axis Sensor of absolute vibrations, turbine – Y axis Sensor of absolute vibrations, generator shaft – axial direction Sensor of absolute vibrations, stator plate 1 Sensor of absolute vibrations, stator plate 2 Sensor of absolute vibrations, stator plate 3 Sensor of absolute vibrations, stator plate 4...
by north | May 13, 2015 | Uncategorized
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Mechanical measurements on turbo aggregate TA-2, it is expected to upgrade eighteen sensors and development of cable systems with all the elements with which the sensor signals are introduced into the system VM600, ie the SCADA system. System is installed in “Panonske” Thermal power plant – Heating plant. In accordance with the terms of reference next measurements are covered: Measuring the speed of rotation 1 Measuring the speed of rotation 2 (used for measuring range of the previous measurements with these to increase the resolution in the vicinity of the nominal speed (2800-3200 r / min) Measuring the expansion cylinder high pressure turbine Measuring the deflection of the rotor Measuring openness cylinder high pressure turbine Measuring the axial displacement of the intermediate pressure turbine zone 1 Measuring the axial displacement of the intermediate pressure turbine zone 2 Measuring the expansion cylinder, medium-pressure turbine Measuring openness cylinder low pressure turbine Measurement of the expansion cylinder of low pressure turbine The expansion of the turbine housing 1 The expansion of the turbine housing 2 Measuring the angle of the rotor turning Disposition measurement of mechanical measurements on aggregate...
by north | May 13, 2015 | Uncategorized
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Project of Online system for monitoring and protecting the flue gas fan from vibration (Thermal power plant “Kolubara” – BlockA5). System of online to protect the fan flue gas boilers 6, block A5 of vibration, is a modular system of simultaneous multi-channelonline monitoring and care beds in relation to the parameters of vibration, all in accordance with ISO 10816-1:1996 and ISO 10816-5:2000. Scheme of the measuring chain...