by Admin | Jul 9, 2015 | Hydro P.P., Projects
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Vibration Protection and Monitoring System Investor: “Drinsko-limske HE” Bajina Bašta, Serbia Object Name: “Elektromorava” ?a?ak, “Me?uvršje” Hydro Power Plant, A1 i A2 Units Installed Power/Turbine Type: 2.5MW; 4.5MW/Kaplan Object Location: ?a?ak, Serbia Brief Project Description: “Medjuvrsje” HPP has two units with Kaplan type turbines. The total installed power of the power plant is 9MW. This project is realized as part of the rehabilitation of the power plant. By now, delivery, installation and commissioning of two Vibration Monitoring Systems (VMS) by Provibtech have been completed. Both installed systems function as vibration protection systems supported by the SCADA/DCS system and are integrated into the power plant control system control system. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project has been realized by the following Members of NORTH Group: NORTH Point – delivery of equipment and project realization NORTH Protection – installation and commissioning NORTH Control – testing, functional control and settings Below is a schematic map of units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Relative Shaft Vibration, ISO 7919-5 2. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 3. Measurement Line of Absolute Stator Core Vibration 4. Measurement Line of Rotor Axial Position 5. Measurement Line of Rotational Speed and Key...
by Admin | Jul 9, 2015 | Hydro P.P., Projects
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Implementation of Protection and Vibration Monitoring System – “Turnkey Project” Investor: Electric Power Industry of Serbia, Belgrade, Serbia Object Name: “Vlasinske HE” Surdulica, “Vrla 2? Hydro Power Plant, 2A and 2B Units Installed Power/Turbine Type: Two Units, Total 24 MW/Francis Object Location: Surdulica, Serbia Brief Project Description: “Vrla 2” HPP has two units with Francis type turbines. The total installed power of the power plant is 24MW. This project is realized as part of the rehabilitation of the power plant control system. By now, delivery, installation and commissioning of two VM-600 monitoring systems by MEGGITT has been completed. Both installed systems function as vibration protection systems independent of SCADA/DCS, however they are integrated into the power plant control system as well. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project is realized jointly by MC-monitoring SA, Switzerland, IMP Automation & Control Systems Ltd, Serbia, NORTH Protection Ltd and NORTH Control Ltd, both Members of the NORTH Group, Serbia: MC-monitoring SA – production and delivery of components and assemblies IMP Automation & Control Systems Ltd – project preparation and SCADA/DCS connection NORTH Protection Ltd – installation and commissioning NORTH Control Ltd – quality and quantity control, testing, functional control and settings Below is a schematic map of units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Relative Shaft Vibration, ISO 7919-5 2. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 3. Measurement Line of Absolute Stator Core Vibration 4....
by Admin | Jul 9, 2015 | Hydro P.P., Projects
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Protection and Condition Monitoring System Investor: “Hidroelektrane na Drini” Višegrad, Bosna i Hercegovina Object Name: “Višegrad” Hydro Power Plant, A1, A2 i A3 Units Installed Power/Turbine Type: 3×105 MW/Kaplan Object Location: Višegrad, Bosnia and Herzegovina Brief Project Description: “Višegrad” HPP has three units with Kaplan type turbines. The total installed power of the power plant is 315MW. This project is realized as part of the modernization of the power plant control system. By now, delivery, installation and commissioning of three GE/BN 3500 Condition Monitoring Systems (CMS) by General Electric have been completed. Although all three installed systems function as CMS independent of SCADA/DCS, they are also integrated into the power plant control system. Protection levels of vibration are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project is realized jointly by IMP Automatika Ltd, Serbia, NORTH Protection Ltd, NORTH Control Ltd, both Members of the NORTH Group, Serbia and Caldera Ltd, RS, Bosnia and Herzegovina. Below is a schematic map of units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 2. Measurement Line of Relative Shaft Vibration ISO 7919-5 3. Measurement Line of Absolute Stator Core and Generator Housing Vibration 4. Measurement Line of Rotor Axial Position 5. Measurement Line of Rotational Speed and Key Phasor 6. Measurement Line of Magnetic Flux 7. Measurement Line of Air Gap 8. Measurement Line of Partial...
by Admin | Jul 9, 2015 | Hydro P.P., Projects
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Delivery of Air Gap Sensors for Condition Monitoring System Investor: Electric Power Industry of Montenegro, Niksic, Montenegro Object Name: Perucica HPP Installed Power/Turbine Type: Total 307MW/Pelton Object Location: Niksic, Montenegro Brief Project Description: “Peru?ica” HPP has seven units with Pelton type horizontal turbines. The total installed power of the power plant is 307MW. The project was implemented as part of the procurement of spare parts (Air Gap Sensors by MC-monitoring) for the existing monitoring systems in “Peru?ica” HPP. The project is realized jointly by IMP Automatika Ltd,Serbia, NORTH Protection Ltd, Member of the NORTH Group, Serbia and EFusion Ltd, Montenegro....
by Admin | Jul 9, 2015 | Hydro P.P., Projects
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Implementation of Protection and Vibration Monitoring System – “Turnkey Project” Investor: Electric Power Industry of Serbia, Belgrade, Serbia Object Name: “Vlasinske HE” Surdulica, “Vrla 4? Hydro Power Plant, 4A and 4B Units Installed Power/Turbine Type: Two Units, Total 25.4 MW/Francis Object Location: Surdulica, Serbia Brief Project Description: “Vrla 4? HPP has two units with Francis type turbines. The total installed power of the power plant is 25.4 MW. This project is realized as part of the rehabilitation of the power plant control system. By now, delivery, installation and commissioning of two “Rhino PMS-300” monitoring systems by MC-monitoring have been completed. Both installed systems function as vibration protection systems independent of SCADA/DCS, but they are also integrated into the power plant control system as well. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project is realized jointly by MC-monitoring SA, Switzerland, IMP Automation & Control Systems Ltd, Serbia, NORTH Protection Ltd and NORTH Control Ltd, both Members of the NORTH Group, Serbia: MC-monitoring SA – production and delivery of components and assemblies IMP Automation & Control Systems Ltd – project preparation and SCADA/DCS connection NORTH Protection Ltd – installation and commissioning NORTH Control Ltd – quality and quantity control, testing, functional control and settings Below is a schematic map of units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Relative Shaft Vibration, ISO 7919-5 2. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 3. Measurement Line of Absolute Stator...
by Admin | Jul 9, 2015 | Other Ind. Sectors, Projects
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Vibration Protection System for Compressors Investor: “Man Diesel & Turbo”, Germany Object Name: “ArcelorMittal” Ironworks, Messer BH Gas Object Location: Zenica, Bosnia and Herzegovina Brief Project Description: Inadequately selected protection system modules have been replaced by adequate TM0180 modules, manufactured by ProvibTech, USA. After this, the protection system has become connected with the plant control...