by Admin | Jul 9, 2015 | Projects, Thermal P.P
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Sensor Calibration and and Measurement Line Checking of Vibration Protection System at A1 Unit Investor: IMP Automatika Ltd, Serbia Object Name: “Kostolac B” Thermal Power Plant, A1 Unit Installed Power: 2x348MW Object Location: Kostolac-Drmno, Serbia Brief Project Description: The project consisted of two parts. The first part referred to calibration of vibration sensors of the protection system, whereas the second part represented checking of the measurement line of Vibration Protection System, including checking the alarm level on A1 Unit Turbine Generator Set. The project was realized jointly by NORTH Control Ltd and NORTH Protection Ltd, Members of NORTH Group, Serbia....
by Admin | Jul 9, 2015 | Hydro P.P., Projects
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Vibration Protection and Monitoring System Investor: “Hidroelektrane ?erdap” Kladovo, Serbia Object Name: “Vlasinske HE” Surdulica, “Vrla 1” Hydro Power Plant, 1A, 1B, 1C and 1D Units Installed Power/Turbine Type: 2×11.2 MW; 2×14.5 MW/Pelton Object Location: Surdulica, Serbia Brief Project Description: Vrla 1 HPP has four units with Pelton type turbines. The total installed power of the power plant is 50MW. This project is realized as part of the rehabilitation of the HPP control system. Up to now, delivery, installation and commissioning of four VM-600 monitoring systems by MEGGITT have been completed. Apart from functioning as vibration protection systems independent of SCADA/DCS, all installed systems are also integrated into the power plant control system. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project has been realized jointly by IMP Automatika Ltd, Serbia, NORTH Point Ltd, NORTH Protection Ltd and NORTH Control Ltd, Serbia. Below is a schematic map of the units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Relative Shaft Vibration, ISO 7919-5 2. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 3. Measurement Line of Absolute Stator Core Vibration 4. Measurement Line of Rotor Axial Position 5. Measurement Line of Rotational Speed and Key Phasor ...
by Admin | Jul 9, 2015 | Hydro P.P., Projects
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Vibration Protection and Monitoring System Investor: “Drinsko-limske HE” Bajina Bašta, Serbia Object Name: “Elektromorava” ?a?ak, “Ov?ar Banja” Hydro Power Plant, A1 i A2 Units Installed Power/Turbine Type: 2.0MW; 4.0MW/Kaplan Object Location: ?a?ak, Serbia Brief Project Description: “Ovcar Banja” HPP has two units with Kaplan type turbines. The total installed power of the power plant is 8.26MW. This project is realized as part of the rehabilitation of the power plant. By now, delivery, installation and commissioning of two Vibration Monitoring Systems (VMS) by Provibtech have been completed. Both installed systems function as vibration protection systems supported by the SCADA/DCS system and are integrated into the power plant control system. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project has been realized by the following Members of NORTH Group: NORTH Point – delivery of equipment and project realization NORTH Protection – installation and commissioning NORTH Control – testing, functional control and settings Below is a schematic map of units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Relative Shaft Vibration, ISO 7919-5 2. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 3. Measurement Line of Absolute Stator Core Vibration 4. Measurement Line of Rotor Axial Position 5. Measurement Line of Rotational Speed and Key...
by Admin | Jul 9, 2015 | Hydro P.P., Projects
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Vibration Protection and Monitoring System Investor: “Drinsko-limske HE” Bajina Bašta, Serbia Object Name: “Elektromorava” ?a?ak, “Me?uvršje” Hydro Power Plant, A1 i A2 Units Installed Power/Turbine Type: 2.5MW; 4.5MW/Kaplan Object Location: ?a?ak, Serbia Brief Project Description: “Medjuvrsje” HPP has two units with Kaplan type turbines. The total installed power of the power plant is 9MW. This project is realized as part of the rehabilitation of the power plant. By now, delivery, installation and commissioning of two Vibration Monitoring Systems (VMS) by Provibtech have been completed. Both installed systems function as vibration protection systems supported by the SCADA/DCS system and are integrated into the power plant control system control system. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project has been realized by the following Members of NORTH Group: NORTH Point – delivery of equipment and project realization NORTH Protection – installation and commissioning NORTH Control – testing, functional control and settings Below is a schematic map of units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Relative Shaft Vibration, ISO 7919-5 2. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 3. Measurement Line of Absolute Stator Core Vibration 4. Measurement Line of Rotor Axial Position 5. Measurement Line of Rotational Speed and Key...
by Admin | Jul 9, 2015 | Hydro P.P., Projects
Projects GroupThermal Power Plants (TPP) Hydro Power Plants (HPP) Other Industry Sectors (OIS) Basic Project Data Project Name: Implementation of Protection and Vibration Monitoring System – “Turnkey Project” Investor: Electric Power Industry of Serbia, Belgrade, Serbia Object Name: “Vlasinske HE” Surdulica, “Vrla 2? Hydro Power Plant, 2A and 2B Units Installed Power/Turbine Type: Two Units, Total 24 MW/Francis Object Location: Surdulica, Serbia Brief Project Description: “Vrla 2” HPP has two units with Francis type turbines. The total installed power of the power plant is 24MW. This project is realized as part of the rehabilitation of the power plant control system. By now, delivery, installation and commissioning of two VM-600 monitoring systems by MEGGITT has been completed. Both installed systems function as vibration protection systems independent of SCADA/DCS, however they are integrated into the power plant control system as well. Protection levels are set according to ISO 10816-5:2000 and ISO 7919-5:2005 standards. The project is realized jointly by MC-monitoring SA, Switzerland, IMP Automation & Control Systems Ltd, Serbia, NORTH Protection Ltd and NORTH Control Ltd, both Members of the NORTH Group, Serbia: MC-monitoring SA – production and delivery of components and assemblies IMP Automation & Control Systems Ltd – project preparation and SCADA/DCS connection NORTH Protection Ltd – installation and commissioning NORTH Control Ltd – quality and quantity control, testing, functional control and settings Below is a schematic map of units and topology of sensors of the vibration protection system. Legend 1. Measurement Line of Relative Shaft Vibration, ISO 7919-5 2. Measurement Line of Absolute Bearing Housing Vibration, ISO 10816-5 3. Measurement Line of Absolute Stator Core Vibration 4....